5 LAYER & 8 LAYER TENNIS COURT CONSTRUCTION SYSTEM
Standard 5 or 8-Layer System
Base coat for levelling.
2 coats of resurface / strengthening layer + 3 to 5 layers of cushion coats for knee suspension + anti-skid finish + 2 layers of color of your choice with line markings
Colors: Common choices include Blue-Green, Red-Green, or custom dual tones.
Surface Life: 5–7 years with good maintenance.
Note: Surface undulations or poor base slope can cause water clogging, which damages the acrylic layer and may not be covered under warranty.
-----------------------------------
TENNIS COURT SIZE / DIMENSIONS
🎾 Court Size:
Singles Play: 78 ft × 27 ft
Doubles Play: 78 ft × 36 ft
➕ Buffer Zones:
Backside buffer: 21 ft each end
Side buffer: 12 ft each side
🔲 Total Area Required: Approx. 120 ft × 60 ft (7,200 sq. ft)
----------------------------------
💡 Lighting Setup for Night Play High-quality lighting is crucial for competitive and recreational night play.
🔦 Recommended Setup:
Pole Height: 20–25 feet
Lights per Court: 6–8 LED floodlights
Wattage per Light: 200W–400W (IP65/IP66 rated)
Color Temp: 5700K daylight white
Total Load: Approx. 2.4kW to 3.2kW per court
---------------------------------
🎾 Acrylic Court Maintenance✅ Weekly / Monthly Care:
Use a soft-bristle broom or blower to remove leaves, dust, and debris.
Rinse the surface gently with water to remove stains or bird droppings.
Inspect for cracks, surface fading, or ponding water after rains.
✅ Annual / Periodic Tasks:
Apply anti-fungal wash in monsoon-prone areas.
Recoat the surface every 4–5 years (based on usage).
Line repainting may be needed after 3–4 seasons.
❗ Avoid:
Using high-pressure water jets.
Allowing motorized vehicles or sharp-edged objects on the surface.